Start with the bylaws
Every strata has unique rules about renovations. Request a current copy of the bylaws and any renovation guidelines before starting. Look for:
- Approval requirements
- Working hours
- Common-area protection
- Insurance requirements
- What trades are permitted on-site
Approval package essentials
A clean strata approval package typically includes:
- Scope description
- Drawings (if structural)
- Trade licenses and WCB clearances
- Liability insurance certificates
- Schedule
- Deposit (if required)
We assemble this package on every Vancouver strata renovation we run.
Elevator bookings, notices and quiet hours
Most Vancouver buildings require:
- Elevator booking for demolition days and material deliveries
- Neighbour notices posted 48–72 hours in advance
- Quiet hours — typically 9 AM–5 PM weekdays only
Plan deliveries and demolition around these constraints — they shape the schedule more than you would think.
Common pitfalls
- No waterproof membrane behind tile — guaranteed leak in 3–7 years
- Wrong subfloor prep for heated floors
- Skipping the vent fan rough-in — strata bylaws often require humidity-sensing fans now
Get these right at the start and you have a bathroom that lasts.
FAQs
Does the strata always need to approve a bathroom renovation?+
In nearly every Lower Mainland strata, yes. Even cosmetic work that does not touch plumbing typically requires written notice and an alteration agreement.